Page 7 - Nov-Dec2022 Vol 40 No 5
P. 7

infrastructure into grade separated   constructed greenway connection (Duck
         greenway amenities.                 Pond Phase 2) across two existing rail   “When I first saw those massive
           Even while tackling the environmental   bridges that had joined the Aluminum   concrete bridges, it reminded me of
         obstacles of a brownfield development,   Company of America’s West Plant
         the city incorporated low impact    and South Plant (one over an existing   the incredible amount of effort that
         drainage design into the corridor, and   roadbed and the other across Pistol   went into forming the company and
         constructed a roundabout to calm traffic   Creek).                        the town. I knew we should try to save
         while improving intersection efficiency.    This key passage provides an additional
         The roundabout, which replaced the   0.51 miles of trail to the greenway   them and fortunately, they along with
         previous four-way stop at the intersection  system. The greenway connection now   the railroad trestle over Pistol Creek
         of E. Edison Street and Springbrook   allows pedestrians safer walkability from   fit in perfectly to forming the basis
         Road, also was designed to greatly   E. Edison Street to Alcoa High School
         improve safety.                     and contributes to the aesthetics and   for a greenway connector for the new
           After a long process of dealing with   cohesiveness of the campus. The city   High School.”
         COVID, virtual meetings, and school   has been extremely happy to have this       – City Manager Mark Johnson
         construction traffic, the project was   connection in place.
         deemed substantially complete in August   Overall, the project was deemed a
         of 2022.  The project included all utility   success because it:
         work, lighting, sidewalks, and enhanced   •  provides ease of access into the
         swales along both sides. Marconi      Springbrook neighborhood
         Boulevard is now a 0.73-mile section   •  alleviates school traffic
         of roadway, crossing directly in front of   •  aides in accessibility for pedestrians
         Alcoa High School.                    using the greenway connection,
                                             •  and allows city staff to travel quickly
         Innovative Greenway Connection        and safely between the City of
           A significant achievement of the    Alcoa Service Center and Municipal
         project was the aforementioned newly-  Building.                           Bridges over Marconi before restoration




















































                                                                                        View online at tnpublicworks.com   7
   2   3   4   5   6   7   8   9   10   11   12