and reducing inflow and infiltration   maintenance needs and the associated   slightly larger, with a capacity of 5 million
         from rainwater and groundwater. The   costs.                             gallons and a height of 49 feet.
         team employed three rehabilitation                                        Both new wet weather storage facilities
         technologies: cured-in-place pipe lining,   Increasing Conveyance Capacity  give the wastewater collection and
         pipe bursting and manhole rehabilitation.  The second phase of the program   transmission system an offline storage
           The team installed cured-in-place pipe   called for two conveyance improvement   facility that can hold excess wastewater
         (CIPP) lining to rehabilitate 32 miles of   projects, designed to enable Springfield’s   during high flow rates, using a diversion
         sewer lines. A cost-effective, trenchless   accommodation in population growth   structure, including gates, a baffle wall
         method that causes less impact on the   and its resulting increased need for public   and a weir that was built on top of the
         surrounding environment than the    sewer service. The first project upsized   interceptor sewer. When the water level
         traditional “dig and replace” excavation   10,000 linear feet of sewer lines with new   rises above the top of the weir, it is
         method, CIPP liner’s tight-fitting, jointless   piping ranging in diameter from 8 inches   pumped into the storage tank and held
         and corrosion-resistant protective cover   to 18 inches. The project also included a   there until the flow subsides. Then, using
         increases the longevity of the system.  new pump station and 8-inch force main,   gravity, it is drained backed into the sewer
           An additional 2.5 miles of sewer line   with a capacity of 800 gallons per day, as   system for a controlled flow.
         were rehabilitated using pipe bursting,   well as 58 new manholes and 68 sewer
         a method that pulls a new pipe of the   services. The second project upsized   Significant Improvement
         same size or larger through the existing   18,000 linear feet of sewer line with new   The City of Springfield has met all
         sewer to simultaneously break the existing   piping ranging from 8-inch to 24-inch   the requirements to fulfill the EPA’s
         pipe while replacing it. A trenchless   diameter.                        administrative order on consent, and
         rehabilitation method, pipe bursting   Adding Additional Storage         was awaiting final approval this summer.
         does not produce the same amount of   The third phase of the program called   With more than 52 miles of rehabilitated
         surface disruption as traditional sewer   for additional temporary wastewater   sewer lines, two new storage tanks
         replacement methods.                storage for times when peak flows exceed   and nearly 1,000 improved manholes,
           The team also rehabilitated nearly   what the sewer system can handle. The   Springfield now has the ability to handle
         1,000 manholes, repairing minor holes   facility, located along the Carr Creek   increased demand for decades to come,
         and cracks with cement plugs, coating   interceptor sewer, has a capacity of 4   while also creating a more sustainable
         with epoxy or a hybrid polymer to   million gallons and stands 34 feet tall,   and healthier environment for the greater
         improve structural integrity and reducing  while the Sulphur Fork Creek facility is   community.