Far left: A Barge
employee in the process
of surveying the City’s
stormwater assets
marks the dimensions
of a culvert.
Near left: While taking
inventory, surveyors
typically spend their
entire day in the field.
This process is made
much more efficient by
the modeling software
Germantown chose to
implement.
Master Plan in Action from page 7 evaluated flow diversions and parallel because they were outside of the Federal
drainage systems to alleviate flooding. Emergency Management Agency (FEMA)
Once the PCSWMM model was Special Flood Hazard Area.
implemented, the results were calibrated In addition, Germantown saw a
to ensure it accurately represented the window of opportunity for collaborating With the Stormwater Master Plan
system and could be used to evaluate with developers through their required already underway, City officials were able
flood mitigation alternatives. The model’s regulations and standards. New to reassure the public that they foresaw
implementation also created risk maps by developments still were being constructed; the potential flooding issues, were already
using building footprints and LiDAR data a process likely to continue as the City working to resolve the concerns, and
to identify structures at a greater risk of grows. Developers must answer to certain would approach this effort with new vigor.
flooding. infrastructure obligations, so the City Germantown’s relationship with Barge
leveraged developers’ capabilities to meant the City was not only prepared to
Structures were color-coded on the assist in fixing the stormwater drainage communicate a plan to the community,
risk map to assist in quickly identifying network. but they also had Barge’s help with
problem areas. The Barge Information engaging their constituents.
Management team created a custom tool For instance, if a development is
with GIS capabilities, which uses the progressing in an identified problem Environmental events can wreak
model’s results to generate the LOS for basin, the City could require over- havoc on a community and are beyond
each structure. In terms of this process, detention. Collaboration and the control of even the most efficient
the LOS rating indicates the return period communication between the developer and effective governments. These newly-
each asset could accommodate. and the City allows for better management implemented capabilities and technologies
of the development’s impact on the empower Germantown to respond to
Applying these technologies overall drainage system, not just the pipe immediate needs or events confidently
modernized the City’s data collection and downstream. and quickly.
provided access to real-time, accurate
information. This allowed Germantown to Precise awareness of their stormwater The Results of Effective Collaboration
confidently identify drainage basins with a system enabled Germantown the ability
low LOS and continue to the next phase of to see the larger picture, which alerted Now, twenty years after the City’s
the master plan. them to opportunities to combine growth spurt, prompting the actions
projects. This not only saved funding and taken to develop the master plan and
Efforts Taking Shape staffing resources, it also created greater related efforts, Germantown has earned
accountability between the City and the Malcolm Baldrige National Quality
Determining where to start was only developers. Award. Given to only four municipalities
part of the equation. Barge and the City since its inception in 1987, this is a
of Germantown were now faced with Remediation Efforts in Action prestigious recognition of an entity’s
the task of finding creative solutions to quality in organization and efficiency.
a multi-faceted issue affecting the entire While no municipality wants to face a
city. Though the assets with the lowest crisis, preparation is essential. Through The criteria to be considered are
LOS scores were identified, the solution the geodatabase and the modeling excellence in: leadership; strategy;
could not be contained to those basins. system, City staff can evaluate emergent customer relations; measurement,
needs quickly, like in the storm event analysis, and knowledge management;
A problem of this magnitude and in experienced on June 7, 2019, when an area workforce; operations; and results. The
such highly-developed areas required of Germantown received almost 10 inches Stormwater Master Plan represents one
innovative solutions. Simply making pipes of rain in less than four hours. in a multitude of intentional decisions
or conduits larger in one area only moves that helped the City achieve this
the problem downstream. With this in That June rain event was estimated commendation, and emphasizes their
mind, the City evaluated new detention to have a greater than 10,000-year- dedication to creating a smarter, safer
basins within existing developments, recurrence interval for precipitation. It left community through innovation and
expanded existing detention basins, and more than 100 homes flooded, 90 percent collaboration.
8 TPW March/April 2020 of which did not have flood insurance