STATEWIDE                                                                              By Adam Davidson, P.E.
         Maintaining Links: ABC Techniques



         Benefit Urban, Rural Agencies





           The collapse of the Silver Bridge over   partial road closures for months or even   be standardized so that the contractor
         the Ohio River in 1967 cost the lives of   years from traditional construction   can fabricate replacement items
         67 people and brought national attention   processes, ABC can limit motorists’   identically. This reduces cost and
         to the issue of bridge safety and the need   disruption to a few weekends or non-peak   makes installation more seamless. 
         for maintaining safe structures. This   hours. 
         prompted the United States Congress   Robertson County Bridges: Miller Creek
         to enact the National Bridge Inspection   and Calebs Creek
         Standards (NBIS), nationwide legislation
         for bridge inspection, load rating and   In the case of the Tennessee State
         inventory.                          Route 49 bridge project, a Tennessee
           The NBIS establishes the minimum   Department of Transportation (TDOT)
         qualifications required for the country’s   rehabilitation project was needed on
         bridges, ensuring that routine, proper   two rural Robertson County bridges
         safety inspections regularly evaluate   originally built in 1929 and rehabilitated
                                             in 1964. Using ABC techniques, both
         the loading demands of a constantly   the Millers Creek Bridge and the Calebs
         changing freight logistics industry,   Creek Bridge were converted from two
         which is necessary in preserving bridge
         service life.                       span to single span structures with
           With proper maintenance, the lifespan   most of the work completed during a
         of new bridges can be around 75     single weekend closure, limiting traffic
         years. However, older bridges were not   disruptions to just 56 hours.  
                                               The following checklist can help an
         designed for that length of time, thus an   agency determine if ABC is the right
         increasing number are in need of repairs   solution for repairing or replacing a
         or replacement. 
                                             bridge:  
         Accelerated Bridge Construction (ABC)   •  Minimized Impacts on Drivers: A
           Accelerated bridge construction (ABC)   major benefit to using ABC is the
         may be the solution for local urban or   minimization of risk and improvement
         rural agencies who are looking at their   of safety for the immediate area.
         own bridge infrastructure. Growing    Bridge and roadway closures have an
         municipalities and rural counties can   immediate impact on society and the
         greatly benefit from a number of advances   daily users. The length of time and
         made in recent years as it relates to   traffic congestion for the relocation of
         ABC, since much of the fabrication and   traffic onto a detour also are important
         assembly can be completed long before   factors. How will this affect emergency
         any road closures are announced.      routes? Business and school access?
           When addressing unsafe conditions in   What about the local environment?  
         bridge evaluations, the most economical   •  Factored In Site Conditions: To save
         solution often is to repair or rehabilitate   time and headaches, prefabrication of
         a structure to extend its functional   certain bridge units can be constructed
         life. According to the Federal Highway   offsite by the contractor, then
         Administration, approximately 25%     installed and joined together during
         of the nation’s 600,000 bridges are in   a weekend road closure. Geometrics,
         need of repairs, rehabilitation or total   and conditions such as condition of
         replacement.                          the bridge, all impact the feasibility of
           Depending on the project, location and   ABC. 
         a variety of other factors, ABC proves to   •  Standardized Plans: When dealing
         be beneficial when taking into account   with multiple bridges along a
         the reduced disruption to community   roadway, the contractor will need a
         residents, as well as user, economic and   bridge-specific removal plan for each
         societal impacts. Instead of dealing with   structure, but the repair details can